The scope of work in this project included the supply and installation of reinforced stormwater drainage pipes and drainage pits for Cargo Road upgrade in Orange. The project was carried out over 6 months, and the total cost was $980,000.
The scope of work in this project included the supply and installation of reinforced stormwater drainage pipes and drainage pits for Cargo Road upgrade in Orange. The project was carried out over 6 months, and the total cost was $980,000.